History

  • 2017

    December

    Dealership of ShaanGu Power

    EnergoTechService acquires the status of an authorized dealer of the largest in South-East Asia manufacturer of turbocharger equipment ShaanGu Power.

  • 2017

    September

    Dealership of GE Jenbacher

    EnergoTechService acquires the status official distributor and service partner of GE’s Jenbacher.

  • 2017

    September

    The construction of the plant begins

    An agreement with the Government of the Tyumen region on the construction of a production center of EnergoTechService in technology park Borovskiy (17 km from Tyumen) was signed.

  • 2017

    August

    GRPP in 4 months

    In record time (4 months) the first stage of gas reciprocating power plant in Kuyumbinskoe field (OOO Slavneft-Krasnoyarskneftegaz)

  • 2016

    December

    Conference-2016

    EnergoTechService together with GE Distributed Power holds a conference in Tyumen «GE Waukesha Reciprocating Gas Engines in gas and oil technologies».

  • 2016

    September

    IN THE LIST OF THE BEST OF THE TYUMEN COMPANIES

    EnergoTechService ranked 37th in the “TOP-100 Major Tyumen companies”.

  • 2016

    August

    NEW PORT: PLUS 12.3 MW

    The second phase of the energy complex of Novoportovskoye field (Gazpromneft-Yamal), based on nine units of GRU Cummins has started to operate industrially. The capacity of the energy complex has doubled - from 12.3 MW to 26.5 MW.

  • 2016

    July

    Dealership of GE WAUKESHA

    EnergoTechService has achieved the status of an official distributor and service partner of GE Waukesha.

  • 2015

    May

    The overhaul program for Gazpromneft-Noyabrskneftegaz has started

    The major overhaul program of the GPU GE Waukesha VHP 5904 for Gazpromneft-Noyabrskneftegaz has started. On the energy center site of the Chatylkinskoye field, a new mobile service center has deployed.

  • 2015

    February

    Service management was to start

    A new business unit in frames of EnergoTechService has been created – Service management. The unit is intended to build and regulate every process of power and technological equipment service.

  • 2014

    December

    Testing of GRPP for RCC

    The comprehensive testing of the biggest in Russia Gas Reciprocating Power Plant, based on GRU MWM (Russian copper company, Mikheevskiy GOK) has been completed.

  • 2014

    November

    The construction on the Verkh-Tarskoye field started

    The beginning of construction of two technological facilities on the Verkh-Tarskoye field (Novosibirskneftegaz) – condensate collection plant and light fractions capture plant.

  • 2014

    October

    GRPP of Yaro-Yakcinskoye field

    In less than three months, a gas turbine power plant in Yaro-Yakcinskoye field (Arktikagaz) with the installed capacity of 24 MW, based on the three Gas Turbine Units of “Motor Sich”, has been constructed and started industrial operating.

  • 2013

    November

    Beginning of works in Novoportovskoye field

    EnergoTechService started power supply of Novoportovskoye field (Gazpromneft-Yamal). By 2015, the energy complex has reached 12.3 MW of capacity (8 GRU Cummins).

  • 2013

    October

    Construction and installation department begun work

    Construction and installation department in frame of EnergoTechService has been created.

  • 2013

    July

    Severo-Urengoyskoye field got auxiliaries power supply complex

    Gas reciprocating power plant with 5.5 MW based on GRU of GE Waukesha has started to operate in the Severo-Urengoyskoye field (Northgas). EnergoTechService has maintained the operation and service of electrical equipment, heating lines, and power networks.

  • 2012

    February

    Rental load devices

    EnergoTechService holds the comprehensive testing of the GRU Wartsila on Oil Pumping Station-12 and Oil Pumping Station-13 (OAO Transneft), using high-voltage load devices from its own rental fleet.

  • 2011

    June

    Diesel Electrical Station for drilling

    The start of forming the Diesel Electrical Station’s rental fleet to supply power for drilling. In one year, 18 Diesel electrical stations had expanded the fleet.

  • 2011

    April

    The start of the operation of OAO RITEK objects

    The start of the operation and service of the electrical equipment, heating lines, and power networks of the OAO RITEK objects in Yamal-Nenets Autonomous Area, since 2012 also in the Republic of Tatarstan.

  • 2010

    June

    Power supply of Ravninnoye field

    EnergoTechService has commenced the power supply of Ravninnoye field (Gaspromneft- Noyabrskneftegas). Gas reciprocating power plant based on the two units of the GRU GE Waukesha VHP 5904 was launched in the short term.

  • 2009

    February

    Take more than 30 units of reciprocating equipment in operation

    The contract for the integrated operation of power utilities of Kholmistoye and Chatylkinskoye fields (Gaspromneft- Noyabrskneftegas) has been signed. It is more than 30 units of generating equipment (including 17 units of GRU GE Waukesha VHP 5904).

  • 2008

    July

    New presence regions and activities

    The strategic decision to significantly expand the presence regions and activities of EnergoTechService has been made.

  • 2008

    May

    New management

    The new management team led by director and Honored Power Engineer of the Russian Federation Aleksandr Svergin has started to work. The new office in Moscow has opened.

  • 2005

    June

    Industrial service base in Yalutorovsk

    To organize repairs of power equipment in workshop conditions, EnergoTechService first rents, and in June 2006 acquires a production and service base in Yalutorovsk (70 km from Tyumen).

  • 2005

    April

    Development of the West Siberia

    EnergoTechService strengthens its presence in the fields of Western Siberia - Zapadno-Krapivinskoye (Omsk region), Archinskoye (Tomsk region), Urmanskoe (Tomsk region) and Priobskoye (KhMAO) fields. It was decided to open the Tarsky operation site (in 2008 it was reorganized).

  • 2003

    April

    The first Gas Reciprocating Power Plant in operation

    EnergoTechService starts operating its first gas piston power plant at the Yaraynerskoye field. The 6575 kW power plant based on GRU Cummins operates on associated petroleum gas.

  • 2003

    April

    Yakutia as a new region of presence

    A contract was signed for the operation of power equipment and networks of the Zapadno-Ozernoye gas field (Anadyrsky district, Chukotka Peninsula).

  • 2003

    February

    Operation of the utilities of Sibneft-Noyabrskneftegas

    The beginning of operation of the energy facilities of the Sibneft-Noyabrskneftegaz fields in the Yamal-Nenets Autonomous District (in the districts of Noyabrsk, Muravlenko, Yety-Pur river, the Vyngapur Village) and the Omsk Region (Zapadno-Krapivinskoye Field).

  • 2002

    August

    Registration and opening of the company office

    The constituent documents are registered and the office of EnergoTechService is opened in Tyumen.